Skip to content
BOOK A DEMO
Electrical project guide

Know what matters. Plan electrical clearly.

Follow the five phases that make electrical work easier to describe, verify, approve, and document. Field conditions and requirements are still confirmed by the professional.

Trade know-how

Understand the job before it starts.

Electrical scope depends on the circuit, load, route, panel, and the difference between a known installation and an unknown fault. Use these five phases to describe the work clearly. The professional still verifies field conditions, requirements, and the final scope.

How this work starts

Details first; a visit when needed

  1. Name the result

    • Describe the device, circuit, room, symptom, timing.
    • Also include desired result—installation, replacement, upgrade, or diagnosis.
  2. Document what is visible

    • From a safe position, record panel labels, device locations, breaker behavior, model information, and photos.
    • Do not remove covers or handle energized parts.
  3. Use the honest review path

    • A known device or circuit path may be details-first.
    • Power loss, overheating, repeated trips, service work, hidden wiring, or specialist loads need licensed field testing first.
  4. Approve the written scope

    • The plan should name the circuit and route, load assumptions, devices, panel work.
    • Also confirm patching, shutdown, permit, inspection, testing, and specialist boundaries.
  5. Keep one project record

    • Continue in Completa to keep panel and device details, approvals.
    • Also keep permit and inspection records, test results, photos, and changes connected.

From request to accepted work

Know what happens at each decision.

You provide what can be observed. Completa organizes it into a project request. Whether that request can be estimated remotely depends on the facts, and a professional reviews the real project before any agreement is accepted.

  1. 01 · Scope

    Build the scope from observable facts.

    Record the address, requested work, measurements, safe photos, condition, access, timing, and anything still unknown.

  2. 02 · Estimate or field review

    Estimate what is defined; review what is not.

    Supported work with enough reliable detail can receive a scope-based estimate. Unresolved site facts require field review first.

  3. 03 · Choose and review

    Choose a pro; the pro reviews.

    Where matching is available, review the connection and decide whether to continue. The pro reviews the actual request before agreement.

  4. 04 · Accepted work

    Accept only the reviewed work.

    The reviewed scope, price, and terms both sides approve become the project record—not the unreviewed request by itself.

What field review means

A field review resolves facts a screen cannot safely confirm.

A professional checks site conditions that answers, photos, or remote measurements cannot establish. This protects both sides from pricing undefined work; it does not guarantee acceptance or a particular price, and Completa does not fill unknown scope with an invented number.

No submitted estimate becomes accepted work until a professional reviews the project and both sides agree to the scope, price, and terms.

Accuracy references

Official guidance supports the safety, permit, and inspection notes on this page.

Take the details with you

Continue the project in Completa.

The app asks the electrical-specific questions and keeps photos, scope, approvals, milestones, and the project record together.

Continue in Completa