Plumbing project guide

Know what matters. Plan plumbing clearly.

Follow the five phases that make plumbing work easier to describe, verify, approve, and document. Field conditions and requirements are still confirmed by the professional.

Trade know-how

Understand the job before it starts.

Plumbing work is clearer when the symptom, fixture, water status, and access are separated before anyone assumes the repair. Use these five phases to describe the work clearly. The professional still verifies field conditions, requirements, and the final scope.

How this work starts

Details first; a visit when needed

  1. Name the result

    • Name the fixture or line, where the problem appears, when it started.
    • Also clarify whether you need repair, replacement, installation, or diagnosis.
  2. Document what is visible

    • Record visible water, meter movement, shutoff location, affected rooms, fixture labels, access panels, and safe photos.
    • Stop active damage when it is safe to do so.
  3. Use the honest review path

    • Known installations can start from complete details.
    • Leaks, stoppages, pressure issues, hidden piping, or failed equipment require a plumber to locate the cause and access in the field.
  4. Approve the written scope

    • Confirm the fixture or part, access and wall repair, shutdown, permit or inspection responsibility.
    • Also confirm testing, cleanup, and any water-damage work outside the plumbing scope.
  5. Keep one project record

    • Continue in Completa with the fixture details, site findings, approved work.
    • Also keep testing proof, permit records when applicable, and any documented change.

From request to accepted work

Know what happens at each decision.

You provide what can be observed. Completa organizes it into a project request. Whether that request can be estimated remotely depends on the facts, and a professional reviews the real project before any agreement is accepted.

  1. 01 · Scope

    Build the scope from observable facts.

    Record the address, requested work, measurements, safe photos, condition, access, timing, and anything still unknown.

  2. 02 · Estimate or field review

    Estimate what is defined; review what is not.

    Supported work with enough reliable detail can receive a scope-based estimate. Unresolved site facts require field review first.

  3. 03 · Choose and review

    Choose a pro; the pro reviews.

    Where matching is available, review the connection and decide whether to continue. The pro reviews the actual request before agreement.

  4. 04 · Accepted work

    Accept only the reviewed work.

    The reviewed scope, price, and terms both sides approve become the project record—not the unreviewed request by itself.

What field review means

A field review resolves facts a screen cannot safely confirm.

A professional checks site conditions that answers, photos, or remote measurements cannot establish. This protects both sides from pricing undefined work; it does not guarantee acceptance or a particular price, and Completa does not fill unknown scope with an invented number.

No submitted estimate becomes accepted work until a professional reviews the project and both sides agree to the scope, price, and terms.

Accuracy references

Official guidance supports the safety, permit, and inspection notes on this page.

Take the details with you

Continue the project in Completa.

The app asks the plumbing-specific questions and keeps photos, scope, approvals, milestones, and the project record together.

Continue in Completa